Equipment R&D and Delivery Workflow

01
Engineer Icon

R&D Engineer :

  • Finalized Design
  • Engineering Drawings
  • Bill of Materials (BOM)
02
Engineer Icon

MC Plan :

  • Long Lead Time Material Identification PR Request
  • Material Lead Time
03
Engineer Icon

Procurement :

  • Supplier Selection
  • Order Allocation
04
Engineer Icon

MP Plan

  • Production Resource Preparation

PC Plan

  • Production Scheduling and Assignment

IQC

  • Material Inspection and Warehousing

ME

  • SOP PMP

QA

  • Quality Inspection Criteria
05
Engineer Icon
  • Cable Fabrication
  • PCB Fabrication
  • Module Assembly
06
Engineer Icon
  • Final Assembly
  • Wiring
  • Debugging
07
Engineer Icon
  • OQC
  • FAT
  • Packing & Shipment
08
Engineer Icon
  • On-site Installation
  • Debugging
  • Trial Run

Customer Service

Project Management
Training will be provided to ensure that operators are capable of independently operating the equipment and system, performing routine maintenance, and handling common faults and repairs.
Personal Training
At least 2 training sessions will be provided annually during the warranty period. Global service support is available.
Service Response
24/7 technical support and operation & maintenance services will be provided.
Spare Parts and Tools
Sufficient spare parts will be provided to ensure normal operation of the equipment for 24 months, all necessary maintenance tools will also be included. Regional offices are equipped with small spare parts depots.